{"id":160,"date":"2016-11-09T14:44:04","date_gmt":"2016-11-09T20:44:04","guid":{"rendered":"http:\/\/limpsacr.com\/?page_id=160"},"modified":"2016-11-09T14:44:04","modified_gmt":"2016-11-09T20:44:04","slug":"portfolio","status":"publish","type":"page","link":"https:\/\/limpsacr.com\/limpsacr\/portfolio\/","title":{"rendered":"Portfolio"},"content":{"rendered":"<p><strong>EXPERIENCIA DE LA EMPRESA<\/strong><\/p>\n<p>(A continuaci\u00f3n detallamos algunos de los proyectos en los que hemos participado como laboratorio de ensayos para el control de calidad)<\/p>\n<p>&nbsp;<\/p>\n<table style=\"height: 14726px;\" width=\"755\">\n<tbody>\n<tr>\n<td width=\"198\"><strong>PROYECTO<\/strong><\/td>\n<td width=\"106\"><strong>LICITACI\u00d3N O CONTRATACI\u00d3N<\/strong><\/td>\n<td width=\"76\"><strong>A\u00d1O<\/strong><\/td>\n<td width=\"189\"><strong>BIEN\/SERVICIO\/OBRA<\/strong><\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PROYECTOS\u00a0 DE\u00a0 CONSERVACI\u00d3N\u00a0 VIAL\u00a0 DE\u00a0 LA\u00a0 RED\u00a0 VIAL\u00a0 NACIONAL<\/p>\n<p>PAVIMENTADA. ZONA 4-1, REGI\u00d3N IV-BRUNCA<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N DIRECTA 2014CD-000140-CV<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N, DESDE NOVIEMBRE 2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REHABILITACION REPRESA QUEBRADAS PEREZ ZELEDON<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2015<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y RESISTENCIA A LA FALLA DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">LAGUNA DE OXIDACION, PEREZ ZELEDON<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2015<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y RESISTENCIA A LA FALLA DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">UNIVERSIDAD DE YORK<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N, DESDE JUNIO 2015<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y RESISTENCIA A LA FALLA DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PLANTA DE TRATAMIENTO DEL AYA, BAJO LAS BONITAS. P\u00c9REZ ZELED\u00d3N<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N, DESDE JULIO 2015<\/td>\n<td width=\"189\">DISE\u00d1OS DE MEZCLA DE CONCRETO; MUESTREOS DE CONCRETO; MOLDEO, CURA Y RESISTENCIA A LA FALLA DE CILINDROS DE CONCRETO.<\/p>\n<p>&nbsp;<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PROYECTO N\u00ba 4 \u201cREHABILITACI\u00d3N DEL SISTEMA DE DRENAJE, COLOCACI\u00d3N DE SUB-BASE Y BASE DE AGREGADOS P\u00c9TREOS Y COLOCACI\u00d3N\u00a0 DE\u00a0 TRATAMIENTO\u00a0 SUPERFICIAL\u00a0 BITUMINOSO\u00a0\u00a0 M\u00daLTIPLE\u00a0 EN\u00a0 EL\u00a0 CAMINO:\u00a0 1-19-194 (ENT.N.242) B. SINA\u00cd, BAJO DOROTEA \u2013 (ENT.C.27) FINCA MUNICIPAL, CANT\u00d3N DE P\u00c9REZ ZELED\u00d3N\u201d <strong>(MOPT-BID)<\/strong><\/td>\n<td width=\"106\">\u00a0\u201cLICITACI\u00d3N P\u00daBLICA NACIONAL 2014LPN-003-32703- PRVC-I-MOPT-BID\u201d.<\/p>\n<p>&nbsp;<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N DESDE FEBRERO 2015<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PROYECTO N\u00ba 3 \u201cREHABILITACI\u00d3N DEL SISTEMA DE DRENAJE, COLOCACI\u00d3N DE SUB-BASE Y BASE DE AGREGADOS P\u00c9TREOS Y COLOCACI\u00d3N\u00a0 DE\u00a0 TRATAMIENTO\u00a0 SUPERFICIAL\u00a0 BITUMINOSO\u00a0\u00a0 M\u00daLTIPLE\u00a0 EN\u00a0 EL\u00a0 CAMINO:\u00a0 1-19-194 (ENT.N.242) B. SINA\u00cd, BAJO DOROTEA \u2013 (ENT.C.27) FINCA MUNICIPAL, CANT\u00d3N DE P\u00c9REZ ZELED\u00d3N\u201d <strong>(MOPT-BID)<\/strong><\/td>\n<td width=\"106\">\u00a0\u201cLICITACI\u00d3N P\u00daBLICA NACIONAL 2014LPN-003-32703- PRVC-I-MOPT-BID\u201d.<\/p>\n<p>&nbsp;<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N DESDE ENERO 2015<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PROYECTO N\u00ba 1 \u201cREHABILITACI\u00d3N DEL SISTEMA DE DRENAJE, COLOCACI\u00d3N DE SUB-BASE Y BASE DE AGREGADOS P\u00c9TREOS Y COLOCACI\u00d3N\u00a0 DE\u00a0 TRATAMIENTO\u00a0 SUPERFICIAL\u00a0 BITUMINOSO\u00a0\u00a0 M\u00daLTIPLE\u00a0 EN\u00a0 EL\u00a0 CAMINO:\u00a0 1-19-194 (ENT.N.242) B. SINA\u00cd, BAJO DOROTEA \u2013 (ENT.C.27) FINCA MUNICIPAL, CANT\u00d3N DE P\u00c9REZ ZELED\u00d3N\u201d <strong>(MOPT-BID)<\/strong><\/td>\n<td width=\"106\">\u00a0\u201cLICITACI\u00d3N P\u00daBLICA NACIONAL 2014LPN-003-32703- PRVC-I-MOPT-BID\u201d.<\/p>\n<p>&nbsp;<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N DESDE ENERO 2015<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PROYECTOS\u00a0 DE\u00a0 CONSERVACI\u00d3N\u00a0 VIAL\u00a0 DE\u00a0 LA\u00a0 RED\u00a0 VIAL\u00a0 NACIONAL<\/p>\n<p>PAVIMENTADA. ZONA 4-1, REGI\u00d3N IV-BRUNCA<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">LICITACI\u00d3N P\u00daBLICA 2009LN-000003-CV<\/td>\n<td width=\"76\">2013-2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONTROL DE CALIDAD Y ASESOR\u00cdA PARA PLANTAS DE PRODUCCI\u00d3N (QUEBRADORES DE PIEDRA, PLANTA DE PREFABRICADOS, PLANTA DE BLOQUES Y ADOQUINES, PLANTA DE CONCRETO, PLANTA DE MEZCLA ASF\u00c1LTICA) Y PROYECTOS EN EL SECTOR P\u00daBLICO Y PRIVADO.<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N, DESDE JUNIO 2011<\/td>\n<td width=\"189\">ASESOR\u00cdA EN PLANTAS DE PRODUCCI\u00d3N; CONTROL DE CALIDAD EN PLANTAS DE PRODUCCI\u00d3N Y PROYECTOS:<\/p>\n<p>MUESTREOS EN PLANTA Y EN CAMPO;<\/p>\n<p>ENSAYOS DE SUELOS, AGREGADOS, MEZCLAS ASF\u00c1LTICAS, CONCRETOS Y MAMPOSTER\u00cdA.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PLANTA DE TRATAMIENTO DEL AYA, CONCEPCI\u00d3N DE PILAS DE CAJ\u00d3N. P\u00c9REZ ZELED\u00d3N<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">DISE\u00d1OS DE MEZCLA DE CONCRETO; MUESTREOS DE CONCRETO; MOLDEO, CURA Y RESISTENCIA A LA FALLA DE CILINDROS DE CONCRETO.<\/p>\n<p>&nbsp;<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">LICITACI\u00d3N ABREVIADA N\u00ba 2014LA-000021-0DI00 (RUTA NACIONAL N\u00ba 335)<\/td>\n<td width=\"106\">LICITACI\u00d3N ABREVIADA N\u00ba 2014LA-000021-0DI00<\/td>\n<td width=\"76\">EN EJECUCI\u00d3N DESDE DICIEMBRE 2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TANQUE AGUA POTABLE, PUERTO JIMENEZ DE PUNTARENAS.<\/p>\n<p><strong>(AYA)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">ENSAYOS PARA CONTROL DE CALIDAD DE CONCRETO Y AGREGADOS. DISE\u00d1O DE BASE ESTABILIZADA.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONTRATACI\u00d3N DE LOS TRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL NO. 625 (LASTRE), ZONA 4-2, SECCI\u00d3NES DE CONTROL NOS. : 60391 (QUEBRADA PAVONA-COLINAS), 60392 (COLINAS-BELLA VISTA), 60393 (BELLA VISTA-T\u00c9RRABA) Y 60394 (T\u00c9RRABA-BRUJO).<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">LICITACI\u00d3N P\u00daBLICA<\/p>\n<p>2012LN-000023-0DI00<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PLANTA EXTRACTORA DE JUGOS, VOLC\u00c1N DE BUENOS AIRES<\/td>\n<td width=\"106\">CONTRATO N\u00ba 190-2014<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">IMPREVISIBILIDAD POR HUNDIMIENTO DE 500 M LINEALES EN LA RN 335; SECCION DE CONTROL 11060, ZONA 4-1; SAN RAMON NORTE \u2013 SANTA EDUGIVES, PEREZ ZELEDON.<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">IMPREVISIBILIDAD:0004-2014<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">IMPREVISIBILIDAD POR HUNDIMIENTO EN KM 4+400, DERRUMBE Y DA\u00d1OS EN LA SUPERFICIE DE RUEDO EN LA RN 331, SECCI\u00d3N DE CONTROL 10860, ZONA 4-1, PEJIBAYE \u2013 QUEBRADA PAVONA. <strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">IMPREVISIBILIDAD:0037-2014<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">MINISTERIO DE EDUCACI\u00d3N P\u00daBLICA DE PEREZ ZELED\u00d3N.<\/p>\n<p><strong>(MEP)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">DISE\u00d1OS DE MEZCLA DE CONCRETO; MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N<\/p>\n<p>&nbsp;<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REMODELACI\u00d3N FACHADA, Y PARQUEO, BANCO NACIONAL DE PALMARES, PEREZ ZELEDON.<\/p>\n<p><strong>(BNCR)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REMODELACI\u00d3N BANCO NACIONAL DE SAN VITO.<\/p>\n<p><strong>(BNCR)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">\u00abTALLER FINCA LOS ANGELES, POTRERO GRANDE\u00bb<\/td>\n<td width=\"106\">CONTRATACI\u00d3N EXTERNA DE SERVICIOS N\u00ba INGE-31-2014<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y RESISTENCIA A LA FALLA DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REMODELACI\u00d3N FACHADA, Y PARQUEO, BANCO NACIONAL DE GOLFITO.<\/p>\n<p><strong>(BNCR)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REMODELACI\u00d3N BANCO NACIONAL DE BUENOS AIRES<\/p>\n<p><strong>(BNCR)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">DISE\u00d1OS DE MEZCLA DE CONCRETO; MUESTREOS DE CONCRETO; MOLDEO, CURA Y RESISTENCIA A LA FALLA DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">ADUANA RIO SERENO<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">ADQUISICI\u00d3N DE EQUIPO DE TOMOGRAFIA Y OBRAS COMPLEMENTARIAS DEL HOSPITAL DR. ESCALANTE PRADILLA<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TRABAJOS PARA LA RUTA NACIONAL EN LASTRE N\u00b0242, SECION DE CONTROL 10540, RIVAS-SAN GERARDO\u201d.<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">LICITACI\u00d3N ABREVIADA 2012LA-000076-0CV00<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TS 3 SAN JOAQUIN , SAN VITO<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LIMITES DE ATTERBERG, PROCTOR, CBR, DISE\u00d1O DE BASE ESTABILIZADA<\/p>\n<p>(BE 25)<\/p>\n<p>&nbsp;<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE EBAIS SAN MARTIN DE GOLFIFO<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">DISE\u00d1O CONCRETO, CBR, ENSAYOS DE PR\u00d3CTOR, CHEQUEOS DE COMPACTACI\u00d3N<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCION DE EBAIS DE PE\u00d1AS BLANCAS<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL NO. 326 (EN LASTRE), SECCIONES DE CONTROL NOS.: 10882-10883, SANTA TERESA-LA HERMOSA, ZONA 4-1 (P\u00c9REZ ZELED\u00d3N)<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">LICITACI\u00d3N ABREVIADA 2012LA-000070-0DI00<\/td>\n<td width=\"76\">2013-2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL NO. 616 (EN LASTRE), SECCI\u00d3N DE CONTROL NO.: 60580 (FINCA MANAGUA (R.N. NO. 34)-LONDRES (CRUCE S\u00c1BALO)); ZONA 3-2<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N DIRECTA<\/p>\n<p>N\u00b02013CD-000136-0DI00<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PLANTA EXTRACTORA DE JUGOS<\/p>\n<p><strong>(CORPORACI\u00d3N DE DESARROLLO AGRICOLA DEL MONTE S.A.-DIVISI\u00d3N PINDECO) <\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N; ENSAYOS CON VELETA.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REHABILITACI\u00d3N DE CAMINOS VECINALES EN EL CANT\u00d3N DE BUENOS AIRES, DISTRITO CH\u00c1NGUENA Y POTRERO GRANDE (RUTAS C\u00d3DIGO 6-03-066, 6-03-047 Y 6-03-063)- PROVINCIA PUNTARENAS\u201d. <strong>(CNE)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N POR EMERGENCIA N\u00b0 EMER-060-2013<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">RESISTENCIA A LA FALLA DE CILINDROS, CHEQUEOS DE COMPACTACI\u00d3N, PR\u00d3CTOR EST\u00c1NDAR.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL N\u00b0 614 (EN LASTRE), SECCIONES DE CONTROL NOS 60271 (BARRIO NUEVO, CANOAS (RN N\u00b0 2)- LA PALMA (ESCUELA) Y 60272 (LA PALMA (ESCUELA) \u2013 LA CUESTA (RN N\u00b0 238)); ZONA 4-3<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N DIRECTA N\u00b0 2013CD-000115-0DI00<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PLANTA DE TRATAMIENTO DE AGUA POTABLE, SANTA ROSA, BUENOS AIRES<\/p>\n<p><strong>(AYA)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">MUESTREOS DE AGREGADOS Y CONCRETO. CHEQUEOS DE COMPACTACI\u00d3N, ENSAYOS PARA CONTROL DE CALIDAD DE CONCRETO Y DE AGREGADOS.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">\u201cTRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL N\u00b0 614 (EN LASTRE), SECCIONES DE CONTROL NOS 60271 (BARRIO NUEVO, CANOAS (RN N\u00b0 2)- LA PALMA (ESCUELA) Y 60272 (LA PALMA (ESCUELA) \u2013 LA CUESTA (RN N\u00b0 238)); ZONA 4-3\u201d.<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N DIRECTA N\u00b0 2013CD-000115-0DI00<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">\u201cTRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL N\u00b0 611 (EN LASTRE), SECCIONES DE CONTROL NOS.: 61010 (LTE. CANT. CORREDORES\/GOLFITO (R. INCENDIO)- CONTE, PAV\u00d3N (CRUCE PLAYA ZANCUDO)) Y 61020 (CONTE, PAV\u00d3N (CRUCE PLAYA ZANCUDO)- PUERTO PIL\u00d3N (CRUCE COCAL AMARILLO)); ZONA 4-3\u201d.<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N DIRECTA N\u00b0 2013CD-000113-0DI00<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">\u201cTRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL N\u00b0 238 (EN LASTRE), SECCI\u00d3N DE CONTROL N\u00b0: 61030 (BELLA LUZ (R.N. N\u00b0611))- LTE.CANT. CORREDORES\/GOLFITO (R. COTO)); ZONA 4-3\u201d.<\/p>\n<p><strong>(CONAVI)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N DIRECTA N\u00b0 2013CD-000116-0DI00<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">OBRAS DE REHABILITACI\u00d3N VIAL EN EL DISTRITO CONTE, TRAMOS\u00a0 CONTE-LA VIRGEN-LANGOSTINO Y CONTE R\u00cdO CONTE, EN EL CANT\u00d3N DE GOLFITO-PUNTARENAS.<\/p>\n<p><strong>(CNE)<\/strong><\/td>\n<td width=\"106\">CONTRATACI\u00d3N POR EMERGENCIA N\u00b0 EMER-054-2013<\/td>\n<td width=\"76\">2014<\/td>\n<td width=\"189\">RESISTENCIA A LA FALLA DE CILINDROS, CHEQUEOS DE COMPACTACI\u00d3N, PR\u00d3CTOR EST\u00c1NDAR.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">&nbsp;<\/p>\n<p>CONTROL DE CALIDAD DE LA RUTA NACIONAL 332, SAN ANTONIO CHINA KICHA<\/p>\n<p><strong>(CONAVI)<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2013<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TRABAJOS PARA LA ATENCI\u00d3N DE LA RUTA NACIONAL EN LASTRE N\u00b0 323, RIVAS DE P\u00c9REZ ZELED\u00d3N A LA PIEDRA DE RIVAS\u00bb<\/p>\n<p><strong>(CONAVI)<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"106\">LICITACI\u00d3N ABREVIADA 2012LA-000048-0CV00<\/td>\n<td width=\"76\">2013-2014<\/td>\n<td width=\"189\">LABORATORIO DE AUTOCONTROL<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE M\u00d3DULOS PARA PRIVADOS DE LIBERTAD Y PARA OFICIALES, EN LA REFORMA DE PALMARES DE P\u00c9REZ ZELED\u00d3N.<\/p>\n<p><strong>(MINISTERIO DE JUSTICIA)<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2013<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; MUESTREOS DE AGREGADOS; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">ZONA INDUSTRIAL FINCA LOS \u00c1NGELES DE POTRERO GRANDE.<\/p>\n<p><strong>(DIVISI\u00d3N PINDECO)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2013<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO; MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REMODELACI\u00d3N DE LA PLANTA EMPACADORA EL SONADOR PINDECO.<\/p>\n<p><strong>(DIVISI\u00d3N PINDECO)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2013<\/td>\n<td width=\"189\">MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; EXTRACCI\u00d3N N\u00daCLEOS DE CONCRETO; MUESTREOS DE AGREGADOS, ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N; ENSAYOS CON VELETA.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CENTRO Y ARTE DE CULTURA, SEDE REGIONAL BRUNCA, P\u00c9REZ ZELED\u00d3N, UNIVERSIDAD NACIONAL.<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2013<\/td>\n<td width=\"189\">MOLDEO, CURA Y FALLA DE CILINDROS DE CONCRETO; ENSAYOS DE PR\u00d3CTOR; CHEQUEOS DE COMPACTACI\u00d3N; ENSAYOS DCP; ENSAYO CORTE SOBRE SUELOS COHESIVOS EN TERRENO USANDO VELETA.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE PARA LA COMUNIDAD DE CAJ\u00d3N DE P\u00c9REZ ZELED\u00d3N.<\/p>\n<p><strong>(AYA)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2013<\/td>\n<td width=\"189\">DISE\u00d1O DE MEZCLA DE CONCRETO; CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYO CORTE SOBRE SUELOS COHESIVOS EN TERRENO USANDO VELETA; ENSAYOS DE PR\u00d3CTOR Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE TANQUES BOLIVIA- SAN GERARDO, P\u00c9REZ ZELED\u00d3N.<\/p>\n<p><strong>(AYA)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2013<\/td>\n<td width=\"189\">CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE VADO SOBRE R\u00cdO \u00c1NGEL.<\/p>\n<p><strong>(DIVISI\u00d3N PINDECO)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREO DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">4 ESTACIONES DE CARGA EN FINCA LOS \u00c1NGELES DE POTRERO GRANDE<\/p>\n<p><strong>(DIVISI\u00d3N PINDECO)<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREOS DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYOS DE GRANULOMETR\u00cdA, PR\u00d3CTOR MODIFICADO, Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PATIO DE MANIOBRAS DE EMPACADORA DE VOLC\u00c1N<\/p>\n<p><strong>(DIVISI\u00d3N PINDECO)<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREOS DE AGREGADO Y DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYOS DE GRANULOMETR\u00cdA, PR\u00d3CTOR, Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE BODEGAS FITOSANITARIAS<\/p>\n<p><strong>(DIVISI\u00d3N PINDECO)<\/strong><\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREO DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PRUEBAS PARA PROYECTO EN BARRIO ALTOS DE ALONSO.<\/td>\n<td width=\"106\">COMPRA DIRECTA 2012CD-339-SPM(246-SCT)<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREOS DE MEZCLA ASF\u00c1LTICA EN CALIENTE (MAC) EN VAGONETA POR CAJA; AN\u00c1LISIS DE MEZCLA ASF\u00c1LTICA EN CALIENTE (MAC); EXTRACCI\u00d3N Y AN\u00c1LISIS DE N\u00daCLEOS DE ASFALTO; MOLDEO, CURA Y FALLA DE BASE ESTABILIZADA; MUESTREO DE AGREGADOS POR SACO; PR\u00d3CTOR MODIFICADO; CHEQUEOS DE COMPACTACI\u00d3N; GRANULOMETR\u00cdA DE AGREGADOS GRUESOS Y FINOS POR LAVADO; L\u00cdMITES DE ATTERBERG; Y VISITAS AL SITIO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">PRUEBAS PARA PROYECTO ASFALTO CALLE COSTADO SUR DEL ESTADIO MUNICIPAL<\/td>\n<td width=\"106\">COMPRA DIRECTA 2012CD-339-SPM(246-SCT)<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREOS DE MEZCLA ASF\u00c1LTICA EN CALIENTE (MAC) EN VAGONETA POR CAJA; AN\u00c1LISIS DE MEZCLA ASF\u00c1LTICA EN CALIENTE (MAC); EXTRACCI\u00d3N Y AN\u00c1LISIS DE N\u00daCLEOS DE ASFALTO; MOLDEO, CURA Y FALLA DE BASE ESTABILIZADA; MUESTREO DE AGREGADOS POR SACO; PR\u00d3CTOR MODIFICADO; CHEQUEOS DE COMPACTACI\u00d3N; GRANULOMETR\u00cdA DE AGREGADOS GRUESOS Y FINOS POR LAVADO; L\u00cdMITES DE ATTERBERG; Y VISITAS AL SITIO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">ADQUISICI\u00d3N DE SERVICIOS DE PRUEBA DE CAMPO Y LABORATORIO PARA DETERMINAR LA CALIDAD CORRESPONDIENTE A LA V\u00cdA CANTONAL 6-05-094-00 (ENT.N.349-OJO DE AGUA. ENT.N.168-BARRIO CANAD\u00c1).<\/td>\n<td width=\"106\">CONTRATACI\u00d3N DIRECTA<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREO A CIELO ABIERTO, GRANULOMETR\u00cdA DE AGREGADOS (BASE, SUB-BASE, SUB-RASANTE), PR\u00d3CTOR MODIFICADO (BASE, SUB-BASE, SUB-RASANTE), L\u00cdMITES DE ATTERBERG (BASE, SUB-BASE, SUB-RASANTE), \u00cdNDICE DE SOPORTE DE CALIFORNIA (CBR) (BASE, SUB-BASE, SUB-RASANTE)<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE ALCANTARILLA DE CUADRO, LAS TRENZAS DE GOLFITO. LICITACI\u00d3N 075-2012<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REHABILITACI\u00d3N DE DRENAJES Y OBRAS EN PEJIBAYE<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">REHABILITACI\u00d3N Y CONSTRUCCI\u00d3N DE SISTEMAS DE DRENAJE Y ESTRUCTURAS DE PASOS EN EL DISTRITO SAN ISIDRO DE P\u00c9REZ ZELED\u00d3N<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE TORRES DE TELECOMUNICACIONES SITIO CTCR 880 A PEJE<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREO DE AGREGADOS Y DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYOS PR\u00d3CTOR MODIFICADO Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE TORRES DE TELECOMUNICACIONES SITIO CR 339 A<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">MUESTREO DE AGREGADOS Y DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYOS PR\u00d3CTOR MODIFICADO Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CONSTRUCCI\u00d3N DE TORRES DE TELECOMUNICACIONES SITIO CR 364 B, FINCA SALAMA<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2012<\/td>\n<td width=\"189\">DISE\u00d1O DE MEZCLA DE CONCRETO; MUESTREO DE AGREGADOS Y DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYOS PR\u00d3CTOR MODIFICADO Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CANCI\u00d3N DE CORAZ\u00d3N<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2011<\/td>\n<td width=\"189\">MUESTREO DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">TORRE DE TELECOMUNICACIONES LA BONITA DE RIVAS.<\/p>\n<p>&nbsp;<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2011<\/td>\n<td width=\"189\">MUESTREO DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYOS DE PR\u00d3CTOR Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<tr>\n<td width=\"198\">CAI P\u00c9REZ ZELED\u00d3N, M\u00d3DULOS DE MEDIANA CONTENCI\u00d3N, EN LA REFORMA DE P\u00c9REZ ZELED\u00d3N.<\/td>\n<td width=\"106\">&#8211;<\/td>\n<td width=\"76\">2011<\/td>\n<td width=\"189\">MUESTREO DE CONCRETO FRESCO; MOLDEO, CURA Y RESISTENCIA A LA COMPRESI\u00d3N DE CILINDROS DE CONCRETO; ENSAYOS DE PR\u00d3CTOR Y CHEQUEOS DE COMPACTACI\u00d3N.<\/td>\n<td width=\"166\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>EXPERIENCIA DE LA EMPRESA (A continuaci\u00f3n detallamos algunos de los proyectos en los que hemos participado como laboratorio de ensayos para el control de calidad) &nbsp; PROYECTO LICITACI\u00d3N O CONTRATACI\u00d3N A\u00d1O BIEN\/SERVICIO\/OBRA PROYECTOS\u00a0 DE\u00a0 CONSERVACI\u00d3N\u00a0 VIAL\u00a0 DE\u00a0 LA\u00a0 RED\u00a0 VIAL\u00a0 NACIONAL PAVIMENTADA. ZONA 4-1, REGI\u00d3N IV-BRUNCA (CONAVI) CONTRATACI\u00d3N DIRECTA 2014CD-000140-CV EN EJECUCI\u00d3N, DESDE NOVIEMBRE 2014 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","footnotes":""},"class_list":["post-160","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/limpsacr.com\/limpsacr\/wp-json\/wp\/v2\/pages\/160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/limpsacr.com\/limpsacr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/limpsacr.com\/limpsacr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/limpsacr.com\/limpsacr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/limpsacr.com\/limpsacr\/wp-json\/wp\/v2\/comments?post=160"}],"version-history":[{"count":0,"href":"https:\/\/limpsacr.com\/limpsacr\/wp-json\/wp\/v2\/pages\/160\/revisions"}],"wp:attachment":[{"href":"https:\/\/limpsacr.com\/limpsacr\/wp-json\/wp\/v2\/media?parent=160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}